Search:   
     
   
POLARIS HORIZON™
POLARIS Horizon   Access Here
     
 
ONLINE STORE
POLARIS Horizon  
     
TESTING
Oil Analysis
  Fuel Analysis
  Coolant Analysis
Metalworking Fluids
Analysis
TRAINING
Oil Analysis
Cooling Systems
Maintenance
HORIZON™ Online
  APPLICATIONS
Engines
  Transmissions
  Hydraulics
  Compressors
  Gear Systems
  Turbines
  INDUSTRIES
Transportation
  Industrial
  Off-Highway
  Power Generation
  Oil and Gas
  Marine
  PRODUCTS
Sampling Equipment
  Sampling Supplies
  Software
  PUBLICATIONS DIRECTORY
eNewsletters
Technical Bulletins
Reference Guides
Forms
FAQ
  CUSTOMER SERVICE
  SITE MAP
 
header photo
About POLARIS
Services
News and Events
Private Label
Contact Us
 
POLARIS Laboratories, LLC - It's not just fluid analysis. It's what we do with it.
Home > Publications Directory > Save of the Month > April 2007
Save of the Month

Oil Analysis Saves $300,000 Mine Shovel Gear System

Brian Groff, an engineer for mine services provider Minserco, Inc., credits oil analysis with saving his company $300,000 to $400,000 in replacement costs on a gear system in one of it’s customers' largest shovels.

"We customized several advanced industrial gear system test slates to closely monitor any changes in the condition of the lubricant," Groff said. "By watching the ICP levels for iron, chromium, nickel and titanium in conjunction with Particle Quantifying and Analytical Ferrography, we were able to accurately identify a wear problem early enough to do something about it," Groff said.

Minserco, Inc., a repair and service subsidiary of Bucyrus, provides mining customers a single-source solution to their maintenance and service needs. The company's mine equipment rebuild services are specifically designed to extend the operating life of used equipment by 50-60,000 hours.

Last October, both ICP and PQ test results on the system showed a considerable spike in the unit's wear metal concentrations. The lubricant was changed and monthly sampling continued. When wear metals rose again this past January, Groff called for an Analytical Ferrograph which confirmed that large ferrous wear was occurring. The lubricant was changed again and when the system was re-sampled a week later, ICP iron values were almost non-existent while the PQ Index showed a significant amount of large ferrous particles. The larger particles were again confirmed by another Analytical Ferrograph and the decision was made to disassemble the unit and rebuild.

"We were able to rebuild the core," Groff said. "The difference between rebuilding it rather than running it to failure and replacing it was between $300,000 and $400,000. That’s a pretty good return on an investment of about $65 in oil analysis."

Groff said that oil analysis has been the basis for changing other maintenance practices at the mine as well, such as testing new lube deliveries for cleanliness and executing drain intervals based on lube condition rather a set schedule.

"Oil analysis has also taught us that new oil isn't always clean oil," Groff said. "In one particular situation, it helped us identify the right supplier so we are now buying cleaner oil with additive packages better suited to our application – and it's lasting longer. Once a new lube is in use, we monitor acid number, which has significantly reduced lube costs by maximizing drain intervals without compromising equipment performance."

For more information, visit www.bucyrus.com/Minserco/minserco.htm.

Submit Your Save-of-the-Month

Send a detailed explanation of your save of the month to jpowers@polarislabs.com, fill out the online form or call 317-808-3750.




topAbout POLARIS | Testing Services | News & Events | Private Label | Contact Us


7898 ZIONSVILLE ROAD INDIANAPOLIS, IN 46268-2177
10910 W. SAM HOUSTON PARKWAY N. SUITE 700 HOUSTON, TX 77064-6314
3060 CALIFORNIA AVE. SUITE B SALT LAKE CITY, UT 84104
5140 75th ST. EDMONTON, ALBERTA CANADA T6E 6W2
TOLL-FREE 877-808-3750 317-808-3750 FAX 317-808-3751

© 2004-2008 POLARIS Laboratories, LLC. All Rights Reserved.